How an order moves from brief to bulk
Minimums and lead times only make sense next to the steps around them. Every order follows this sequence.
- Brief: send the product, quantity, decoration, delivery country and target date through the quote form. A senior account manager replies within 24 hours with pricing and a sampling timeline.
- Mockup: a free digital mockup of your artwork on the chosen style usually arrives within one to two business days after your artwork is received. Ask for one on the free mockup page.
- Sample: a fit and construction sample is approved before bulk production, so artwork, sizing and finishing are signed off first. A physical sample is separate and quoted on request.
- Bulk production: the lead time in the table below, counted from sample approval.
- Shipping: dispatch begins after final QC, packing verification and export carton confirmation. Freight is quoted separately by air, sea or courier, so transit time is not part of the bulk lead time. See the shipping page.
Minimum order by product type
Minimums are set per style and listed on every product page. They are counted in the unit that suits the product (pieces, sets, pairs, units or packages), and the 300 catalog styles use 10, 12, 25 or 50 as their starting quantity. The table groups product types that share the same minimum and lead time.
For packages, the listed minimum is the standard minimum. Smaller trial orders of a package can be quoted on request.
Mixed sizes are supported within a confirmed colorway and construction. Minimums exist across apparel manufacturing because every run means sourcing fabric, cutting a full size range and setting up decoration, and a smaller run spreads that work over fewer garments.
Bulk lead times after sample approval
Bulk lead time is the production window after sample approval. 277 of the 300 catalog styles list 7-10 days, and 23 list 10-14 days. Product types that run at 10-14 days for every style: Team Uniform Packages, Training Packages, Fan Merch Packages and Casual Wear Packages. Cycling Uniforms, E-sports Jersey and Sublimation Hoodie mix both by style, and each product page shows its own figure.
Because the clock starts at sample approval, a late approval moves the whole schedule by the same amount. The sooner artwork, sizes and finishing are signed off, the sooner bulk production begins.
Packages and bundles
Packages bundle several catalog items under one design and one sample approval. Their minimums are counted in complete packages. All items in a package are produced together, so one lead time covers the whole package. The minimum shown is the standard minimum.
- Team Uniform Packages: 12 packages, 10-14 days after sample approval.
- Training Packages: 12 to 25 packages, 10-14 days after sample approval.
- Fan Merch Packages: 25 packages, 10-14 days after sample approval.
- Casual Wear Packages: 25 to 50 packages, 10-14 days after sample approval.
Planning around a delivery date
- Start from the date the goods must arrive and subtract freight, which is quoted separately by air, sea or courier.
- Subtract the bulk lead time for your product type from the table above.
- Leave time before that for the mockup, the sample and any revisions. The mockup page asks for logos as vector files (AI, EPS, SVG or PDF) or a high-resolution PNG.
- Put your target date in the brief so the sampling timeline can be planned against it.
Questions about minimums and lead times
What is the lowest minimum order?
The lowest minimum in the catalog is 10, on Cycling Uniforms. Of the 284 non-package styles, 4 start at 10, 84 start at 12 and 196 start at 25.
Does the lead time include sampling?
No. Catalog lead times count from sample approval. Samples are ready within 1 week. A fit and construction sample is approved first, and a physical sample is separate and quoted on request.
Can I mix sizes within one order?
Yes, within a confirmed colorway and construction.
Do packages have a different minimum?
Yes. Packages are counted in complete packages, and each lists a standard minimum: Team Uniform Packages 12 packages, Training Packages 12 to 25 packages, Fan Merch Packages 25 packages and Casual Wear Packages 25 to 50 packages. Smaller trial orders can be quoted on request. Their lead time is 10-14 days after sample approval.